We’ve been wicked busy over the last few days as the kitchen project and all the gritty details get finished and ironed out. Here’s a quick run-down of what we did:

- Replaced the fill-valve in the toilet. (Not related, but flexing my Uiberall family plumbing prowess. Took me 20 minutes. Booyah!)

- Touched up the painted walls where needed.

- Final polyurethane of random trim areas.

- Cleaned the floors with Murphy’s wood floor cleaner. Good stuff!

- Replaced all of the electrical outlet and switch panels in the kitchen.

- All ground-cloths and protective cover sheets removed from floors and furniture.

- Moved furniture and pictures back into dining room.

- Cleaned and tidied our guest bedroom, which served as the interim kitchen.

- Dumpster was removed from our driveway. We can now park side-by-side in the driveway again.

- Passed the electrical inspection on Monday.

- Passed the plumbing inspection on Tuesday.

All we have left to do is get the building inspection completed (fingers crossed) and to send out our final payment.